Ellevation at North Harbour — architect-designed industrial units
WAREHOUSESTORAGESHOWROOMOFFICE
FOR SALEFOR LEASE

From

$615,000 + GST

138 – 270 m² · 16 units

Completion

4 WEEKS

Onsite inspections welcome now

Availability

13 OF 16

3 under contract (Units 8, 9 + 12)

Built for…

A unit that adapts to your business.

Personal workshop · vehicle storage

Personal workshop · vehicle storage

E-commerce · soft goods · stock

E-commerce · soft goods · stock

Creative studio · production

Creative studio · production

Fitness · functional training

Fitness · functional training

Branded operator fit-out

Branded operator fit-out

Office · light industrial · owner-occupier

Office · light industrial · owner-occupier

Ellevation at North Harbour is a collection of 16 architect-designed tilt-panel industrial units in one of South-East Queensland's fastest-growing commercial precincts. Built for owner-occupiers, expanding businesses — with above-container roller doors, oversized mezzanine clearance and direct Bruce Highway access.

Street frontage with numbered units and on-site parking
Rear access and architectural detail

What sets Ellevation apart

The spec, in four lines.

ENHANCED 3-PHASE

Dedicated on-site transformer

A transformer dedicated to this precinct delivers enhanced 3-phase power to every unit. Run workshop machinery, food production, EV charging, full-service automotive — whatever your business needs, the supply is there.

3 M MEZZANINE

Caravans · boats · bikes

Oversized clearance underneath the mezzanine — a full three metres. Most small-format industrial mezzanines give you 2.4 to 2.7. Park the caravan, store the boat, fit the bike collection.

TALL ROLLER DOORS

Above container-height

Electric roller doors taller than standard container height. Twenty-foot containers and loaded trucks drive straight in — no unloading at the kerb, no height workarounds.

50 CAR PARKS

Exclusive + visitor + short-term

Every unit gets exclusive-use car parking. Plus dedicated visitor bays and short-term spaces across the site. Your team, your customers, your suppliers — all sorted.

Inside the shell

Warehouse below. Office above.

Same shell. Two ways to use it. Render — warehouse fit-out with mezzanine storage. Render — mezzanine and ground-level office workstations.

Mezzanine warehouse fit-out — pallet racking, forklift, storage
Open-plan office under mezzanine — workstations, joinery

The buyer's checklist

The questions buyers actually ask.

Will the building actually be finished — and when?
Approximately four weeks to practical completion (target Q2 2026). The construction-progress strip below shows the build month-by-month. Onsite inspections welcome now; contract documents are in the Information Memorandum.
Can my SMSF buy this?
Yes. Units are industrial-zoned, strata-titled and used wholly for business purposes — Business Real Property eligible under the ATO's Sole Purpose Test. Each unit sits on its own title, so a standard Limited Recourse Borrowing Arrangement (LRBA) applies. SMSF eligibility notes are in the Information Memorandum.
What's the real cost including GST and stamp duty?
From $615,000 + GST is the published ex-GST price. Owner-occupiers who are GST-registered typically claim the GST back; SMSF buyers usually do not. Worked examples for both, plus stamp duty estimates, are in the Information Memorandum. Final treatment depends on your accountant.
Can I unload trucks or containers?
Yes. Electric roller doors are above standard container height — 20-foot containers and loaded trucks drive straight in. The site has a dedicated container loading zone and drive-in / drive-out truck access.
What power and services do I get?
Enhanced 3-phase power to every unit from a dedicated on-site transformer (the only project in the precinct with this). NBN, water, full fire safety. End-of-trip facilities (bathroom + shower) in every unit, ambulant-compliant.
What's left to buy?
13 of 16 units available. Units 8, 9 and 12 are under contract. Marquee corner units 1 and 16 — 269.5 m² with full-height showroom frontage. Full availability and pricing is in the Information Memorandum.

Sent instantly · PDF

Get the Information Memorandum.

The full per-unit price list (incl. GST), individual floor plans, schedule of finishes, estimated outgoings, completion timeline, contract terms and SMSF eligibility notes — everything your accountant, broker or solicitor needs.

By submitting, you consent to Baymark Pty Ltd collecting your name, email and phone to respond to your enquiry and forward to the nominated marketing agents (RWC and Integrated Property Partners). We retain enquiry records for sales-cycle compliance and Australian tax/audit obligations. Read the full collection notice.

No spam. A project representative may call to confirm which unit suits your use.

Or skip the PDF

BOOK A PRIVATE SITE WALKTHROUGH →

~4 weeks from practical completion · onsite inspections welcome now

The precinct

A master-planned community.
A $1 billion business park.

Ellevation sits inside North Harbour — a 785-hectare master-planned community on the southern banks of the Caboolture River. The North Harbour Business Park alone is a 76-hectare, $1 billion precinct forecast to deliver more than 6,400 jobs.

500m
Bruce Hwy Exit 150 · 1 min
44km
Brisbane Airport · 34 min
43km
Brisbane CBD · 60 min
Annotated aerial of North Harbour precinct showing Ellevation, Bruce Highway and surrounding distances

535K

Moreton Bay population (2025)

$24B

Gross regional product

3rd

Largest LGA in Australia

6,416

Jobs forecast across the park

Walking-distance amenity (master-planned)

Shopping centre

Bulky-goods precinct

Pub / tavern

Cafés & food

Fuel stations

Fitness & gym

Residential community

Future marina

Marine industry

Bruce Hwy frontage

Bus stop (858 m)

Train station (2.9 km)

The full reference

Every spec, no fluff.

Unit sizes
138 – 270 m² (warehouse + mezzanine)
Number of units
16 — 13 available, 3 under offer
Pricing from
$615,000 + GST
Mezzanine clearance below
Up to 3 m — caravans, boats, oversized equipment
Roller doors
Electric — above standard container height
Power
Dedicated on-site transformer · enhanced 3-phase to every unit · the only project in the precinct with this
Mezzanine office
Full-height walls · named-brand fit-out by PJ Design Group
Staircase
Half-landing commercial-grade — no steep ladder access
Construction
Concrete tilt-panel
Car parks
50 on-site — exclusive use per unit, visitor and short-term
Container loading
Dedicated zone · drive-in / drive-out truck access
End-of-trip amenities
Bathroom + shower in every unit · ambulant-compliant
Services
3-phase power, NBN, water, full fire safety
Zoning
MIBA — warehouse, showroom, trade, light industrial, storage
Title
Strata — each unit on its own title
Architect
Parups Waring Architects (Denis Waring FRAIA)
Interior design
PJ Design Group · named-brand fixtures throughout
Completion
Anticipated Q2 2026 · approximately 4 weeks to practical completion

Watch us build

From slab to ~four weeks out.

The build, photographed month-by-month. Drone and onsite shots dated to the day.

Slab + early frame — 13 Jan 2026

13 Jan 2026

Slab + early frame

Aerial — roofs on, panels rising — 5 Feb 2026

5 Feb 2026

Aerial — roofs on, panels rising

Mid-construction — 3 Mar 2026

3 Mar 2026

Mid-construction

Aerial — the estate inside North Harbour — 16 Apr 2026

16 Apr 2026

Aerial — the estate inside North Harbour

Onsite — units taking shape — 20 Apr 2026

20 Apr 2026

Onsite — units taking shape

Central driveway poured — 20 Apr 2026

20 Apr 2026

Central driveway poured

Roof + cladding complete — 21 Apr 2026

21 Apr 2026

Roof + cladding complete

Aerial — shells complete, central awning on — 1 May 2026

1 May 2026

Aerial — shells complete, central awning on

Exteriors complete — final trades onsite — 2 Jun 2026

2 Jun 2026

Exteriors complete — final trades onsite

Mezzanine + internal fitout — 2 Jun 2026

2 Jun 2026

Mezzanine + internal fitout

Timber-look soffits + lighting in — 2 Jun 2026

2 Jun 2026

Timber-look soffits + lighting in

Landscaping underway — 2 Jun 2026

2 Jun 2026

Landscaping underway

The team behind the build

Marketing

Baymark

Master-plan developer

Port Binnli

25+ years in Queensland

Architect

Parups Waring

Denis Waring FRAIA

Interior design

PJ Design Group

Exclusive agents

RWC NCG

+ Integrated Property Partners

68 Boreas Drive · Morayfield QLD 4506 · Bruce Highway Exit 150

Ellevation at North Harbour · Inside Port Binnli's North Harbour Business Park